3rd Generation Multi-effect Stills for WFI & Pure Steam production. The units have a number of design features to achieve an optimized function and a safe distillate quality exceeding the latest editions of USP and EP for Water For Injection.
DESIGN FEATURES
* Fully automatic function and surveillance.
* Unique 4 step separation system.
* Maximal operational safety.
* High flexibility
* Pure Steam production from the 1st column.
* Space saving, easy to install
MULTI-EFFECT STILLS, steam heated
TYPE & COLUMNS | PRESSURE | PRODUCTION L/h |
S-100-3 and 4 S-200-3 and 4 S-300-4 and 6 S-500-4 and 6 S-1000-5 and 6 S-2000-5 and 6 S-3000-6 and 8 S-4000-6 and 8 | 3 – 8 bar g 3 – 8 bar g 3 – 8 bar g 3 – 8 bar g 4 – 8 bar g 4 – 8 bar g 5 – 8 bar g 5 – 8 bar g | 100-200 200-400 300-600 500-1100 1200-2100 2800-4100 4400-6200 5800-8000 |
MULTI-EFFECT STILLS, electrically heated
TYPE & COLUMNS | CONNECTION | PRODUCTION L/h |
E-100-3 E-200-4 E-300-4 E-500-6 | 28 kW 44 kW 65 kW 74 kW | 100 200 300 500 |
PLC AUTOMATED STANDARD FUNCTION
* Automatic start/stop on external signal.
* Manual start/stop.
* Automatic pressure keeping to selected value.
* Automatic valve regulation of heating steam, feed water and compressed air.
* Automatic surveillance & alarms of critical process values.
EXAMPLE OF OPTIONAL EQUIPMENT
* Automated or manual valves for Pure Steam production.
* Pure Steam sample condenser.
* Sterile air vent filter and close off.
* Self sterilisation cycle and valves.
* Heat steam safety relief valve & pressure shut off.
* Distillate ”after” cooler to desired temperature.
* Electro polished internal surfaces.
* Boroscope inspection of internal welds.
* Central control cabinet for the complete WFI system.
* WFI storage tanks and loop systems.
FACTORY ACCEPTANCE TESTING
All AQUA-NOVA PS Generators are production FAT tested at our factory before delivery. The tests are documented and the produced steam quality is verified by an independent laboratory.
The software is developed as per GAMP specifications. When ordered, full Pre IQ and OQ documentation will be supplied with the machines, including calibration documents.
*Authorised pressure vessel drawings with materialand weld certificates.
*Mechanical component documentation and manuals.
*Electrical and instrument documentation and manuals.
* Machine installation, operation and service manual
07 21 , 2022
Purified Water RO Unit, double or single in combination with CEDI The units have a number of design features to achieve an optimised function and a safe water quality exceeding the latest editions of USP and EP for Purified Water (PW) or Highly Purified Water […]
06 21 , 2022
The units have a number of design features to achieve an optimised function and a safe distillate quality exceeding the latest editions of USP and EP for Water For Injection. DESIGN FEATURES* Unique 4 step separation system. * Maximal operational safety. * High flexibility * […]
04 21 , 2022
Laboratory ”Water For Injection” Still and Pure Steam GeneratorsThe units have a number of design features to achieve an optimised function and a safe distillate quality exceeding the latest editions of USP and EP for Water For Injection.They characterised by it´s reliability and easy handling. […]
12 21 , 2021
3rd Generation Pure Steam Units with Pure Steam of WFI quality The units have a number of design features to achieve an optimised function and a safe Pure Steam quality, condensed as per the latest editions of USP and EP for Water For Injection. DESIGN […]
12 21 , 2020
The Water Still is the heart and the WFI distribution the bloodstream of your sterile, liquid production. When the Still together with the storage vessel and distribution loop is maintained in good health the risk to product contamination or eventual roduction halts will be avoided. There […]